home *** CD-ROM | disk | FTP | other *** search
/ Tommy Walsh's DIY Guide / Tommy Walsh's DIY Guide (2001)(Empire).iso / hi / awruntime / t7a.txt < prev    next >
Text File  |  1998-10-14  |  2KB  |  62 lines

  1. Summary
  2.  
  3. A noisy filling cistern can be irritating. An alternative 
  4. is a system that fills the cistern from below the water 
  5. line. To fit one follow  these steps below:
  6.  
  7.     1      About noisy fillers
  8.     2     Isolating the water supply
  9.     3     Dismantling the old ball-valve fittings
  10.     4     Attaching the new fittings
  11.     5     Adjusting the float to the required level
  12.     6     Clearing any remaining debris
  13.  
  14. Tools
  15. Adjustable spanner
  16.  
  17. Materials
  18. Silent filler, washer
  19.  
  20. Step 1 - About noisy fillers
  21. Cisterns normally use a ball-valve filler system, which 
  22. can be quite noisy. It is possible to buy a proprietary 
  23. device, which eradicates the ball-valve system and fills 
  24. the cistern from below and hence is silent. Devices are 
  25. available in different sizes for toilets and cold water 
  26. tanks.
  27.  
  28. Step 2 - Isolating the water supply
  29. Locate the stopcock or service valve and turn it clockwise 
  30. to cut off the water supply. Flush the toilet to empty the 
  31. pipes.
  32.  
  33. Step 3 - Dismantling the old ball-valve fittings
  34. Unscrew the tap connector to disconnect the supply from 
  35. the toilet. Unscrew the inner and outer retaining nuts to 
  36. release the ball-valve fittings and remove.
  37.  
  38. Step 4 - Attaching the new fittings
  39. The new fittings will attach to the old tap connector. 
  40. You will to set the required depth tube to 25mm/1inch 
  41. above the cistern bottom by following the makerÆs 
  42. instructions. Adjust the tow back nut so that the new 
  43. fitting attaches to the old threaded tap connector.
  44.  
  45. Step 5 - Adjusting the float to the required level
  46. Reconnect the supply. Always check for leaks after any 
  47. plumbing job. You can adjust the water level to the 
  48. desired position by twisting the float adjustment rod. 
  49.  
  50. Step 6 - Clearing any remaining debris
  51. It is important to clear any debris from the installation. 
  52. To do this, turn off the water supply once more and release 
  53. the float adjustment arm from the arm. Remove the cap 
  54. Assembly by rotating 45 degrees clockwise. Turn the water 
  55. supply back on off a short period and then back off. 
  56. Reassemble the cap, and float arm and adjustment rod before 
  57. restoring the supply once more.
  58.  
  59.  
  60.  
  61.  
  62.